Proactive Maintenance: Extending the Life of Your Medical Equipment in 2025 — A WishCare Guide
- Aayush Kothari
- 1 day ago
- 2 min read
1. Why Maintenance Deserves a Spot at the Top of Your 2025 Budget
A single hour of downtime on critical devices—ventilators, syringe pumps, patient monitors—can set off a chain reaction of canceled procedures, emergency rentals, and reputational damage. International bodies such as the WHO now treat preventive maintenance (PM) as a patient-safety requirement, not a “nice-to-have.” At the same time, India’s new Guidelines on Equipment Maintenance, Calibration & Testing (2024) tie hospital accreditation to documented PM records.
Key takeaway: Well-planned PM reduces unexpected failures by 30-40 % and extends service life by 2-5 years—boosting ROI on every bed, light, or laser you buy.
2. Map the Regulatory Landscape Before You Set the Schedule
Requirement | Applies To | Proof Needed |
WHO “Management & Safe Use of Medical Devices” (2024 update) | All facilities importing Class B and above devices | PM logbooks + safety-test certificates |
MoHFW “Procurement & Maintenance of Medical Equipment” circular (2024) | Govt.-funded hospitals, but becoming best-practice for private sector | Copy of AMC/CMC contract & uptime reports |
State-level SOPs (e.g., Rajasthan 2025) | Public medical colleges | 24/7 helpline tickets + annual structural survey |
Action step for WishCare clients: Download the latest circulars, keep them in your Quality Manual, and audit your maintenance vendor against each clause.
3. Build a Risk-Based Preventive Maintenance (PM) Calendar
Device Risk Class | Daily | Monthly | Semi-Annual | Annual |
High (Life-support) Ventilators, defibrillators | Visual checks & functional self-tests | Electrical safety test | Full calibration | Load test under simulated stress |
Medium (Diagnostic) Ultrasound, ECG | Clean probes & leads | Firmware updates | Probe integrity test | OEM calibration |
Low (Furniture) Fowler beds, OT lights | Tighten bolts | Lubricate joints | Replace gas springs | Structural load test |
Pro tip: Use a simple traffic-light color code (red = overdue, green = on-time) on your digital CMMS dashboard to keep teams accountable.
4. Digital Tools That Slash Downtime in 2025
IoT sensors for vibration & temperature alert you before bearings fail.
QR-code service tagging lets nurses scan a bed and log a fault in seconds.
Remote firmware diagnostics—now standard on WishCare’s latest ICU beds—cut field-engineer visits by up to 50 %.
5. Budgeting: AMC vs. CMC vs. Pay-As-You-Go
Model | Up-Front Cost | Covers Parts? | Best For |
AMC (Annual Maintenance Contract) | 4-8 % of device price/yr | No | New equipment still under warranty |
CMC (Comprehensive) | 8-12 % | Yes | High-risk, high-usage devices post-warranty |
Pay-As-You-Go | None | Yes, at market price | Low-risk items or ultra-tight budgets |
WishCare Tip: Bundle multiple devices into one CMC to win volume discounts and guarantee faster engineer turnaround.
6. Training & Documentation: The Often-Missed Link
5-Minute Daily Checklist for nurses (downloadable PDF)
Monthly “Toolbox Talks” led by your biomedical engineer
Digital PM logs locked for editing after sign-off—vital during NABH audits
7. Measuring Success: Three KPIs to Track
Mean Time Between Failures (MTBF)
Percentage Planned Maintenance Completed (PPMC)
Lifecycle Cost per Operating Hour
Aim for MTBF > 95 days on high-risk devices and PPMC > 90 %. Anything lower signals gaps in your PM plan.
8. How WishCare Can Help
Certified OEM Spare Parts quickly dispatched nationwide
CMMS-Ready Asset Tags pre-installed on every shipment
Expert Biomedical Team for on-site audits and staff workshops
Need a hand designing your maintenance program? Drop us a line at support@wishcare.co.in—we’ll customise a plan that meets WHO, NABH, and state-level SOPs without ballooning your budget.
Comments