top of page
Search

Proactive Maintenance: Extending the Life of Your Medical Equipment in 2025 — A WishCare Guide

1. Why Maintenance Deserves a Spot at the Top of Your 2025 Budget

A single hour of downtime on critical devices—ventilators, syringe pumps, patient monitors—can set off a chain reaction of canceled procedures, emergency rentals, and reputational damage. International bodies such as the WHO now treat preventive maintenance (PM) as a patient-safety requirement, not a “nice-to-have.” At the same time, India’s new Guidelines on Equipment Maintenance, Calibration & Testing (2024) tie hospital accreditation to documented PM records.

Key takeaway: Well-planned PM reduces unexpected failures by 30-40 % and extends service life by 2-5 years—boosting ROI on every bed, light, or laser you buy.

2. Map the Regulatory Landscape Before You Set the Schedule

Requirement

Applies To

Proof Needed

WHO “Management & Safe Use of Medical Devices” (2024 update)

All facilities importing Class B and above devices

PM logbooks + safety-test certificates

MoHFW “Procurement & Maintenance of Medical Equipment” circular (2024)

Govt.-funded hospitals, but becoming best-practice for private sector

Copy of AMC/CMC contract & uptime reports

State-level SOPs (e.g., Rajasthan 2025)

Public medical colleges

24/7 helpline tickets + annual structural survey

Action step for WishCare clients: Download the latest circulars, keep them in your Quality Manual, and audit your maintenance vendor against each clause.

3. Build a Risk-Based Preventive Maintenance (PM) Calendar

Device Risk Class

Daily

Monthly

Semi-Annual

Annual

High (Life-support) Ventilators, defibrillators

Visual checks & functional self-tests

Electrical safety test

Full calibration

Load test under simulated stress

Medium (Diagnostic) Ultrasound, ECG

Clean probes & leads

Firmware updates

Probe integrity test

OEM calibration

Low (Furniture) Fowler beds, OT lights

Tighten bolts

Lubricate joints

Replace gas springs

Structural load test

Pro tip: Use a simple traffic-light color code (red = overdue, green = on-time) on your digital CMMS dashboard to keep teams accountable.

4. Digital Tools That Slash Downtime in 2025

  1. IoT sensors for vibration & temperature alert you before bearings fail.

  2. QR-code service tagging lets nurses scan a bed and log a fault in seconds.

  3. Remote firmware diagnostics—now standard on WishCare’s latest ICU beds—cut field-engineer visits by up to 50 %.


5. Budgeting: AMC vs. CMC vs. Pay-As-You-Go

Model

Up-Front Cost

Covers Parts?

Best For

AMC (Annual Maintenance Contract)

4-8 % of device price/yr

No

New equipment still under warranty

CMC (Comprehensive)

8-12 %

Yes

High-risk, high-usage devices post-warranty

Pay-As-You-Go

None

Yes, at market price

Low-risk items or ultra-tight budgets

WishCare Tip: Bundle multiple devices into one CMC to win volume discounts and guarantee faster engineer turnaround.


6. Training & Documentation: The Often-Missed Link

  • 5-Minute Daily Checklist for nurses (downloadable PDF)

  • Monthly “Toolbox Talks” led by your biomedical engineer

  • Digital PM logs locked for editing after sign-off—vital during NABH audits


7. Measuring Success: Three KPIs to Track

  1. Mean Time Between Failures (MTBF)

  2. Percentage Planned Maintenance Completed (PPMC)

  3. Lifecycle Cost per Operating Hour

Aim for MTBF > 95 days on high-risk devices and PPMC > 90 %. Anything lower signals gaps in your PM plan.


8. How WishCare Can Help

  • Certified OEM Spare Parts quickly dispatched nationwide

  • CMMS-Ready Asset Tags pre-installed on every shipment

  • Expert Biomedical Team for on-site audits and staff workshops

Need a hand designing your maintenance program? Drop us a line at support@wishcare.co.in—we’ll customise a plan that meets WHO, NABH, and state-level SOPs without ballooning your budget.

 
 
 

Recent Posts

See All

Comments


bottom of page